Skip to content

Transportation Infrastructure

Gayle’s Trails (East)

Panama City Beach, FL

Year completed: 2020

Value: 1.4M

The East segment of the Panama City Beach Gayle’s Trails project included the construction of 1.8 miles of a new, 12’ wide multi-use path along an existing transmission line right-of-way. This segment began at the Breakfast Point Academy and extended northwest towards Clara Avenue.

©2026 Panhandle Engineering. All rights reserved.